FLORENCE CITY THEATRE: STRIP OUT AND DECOMMISSIONING

In the historical centre of the city of Florence, Fratelli Omini completed a selective demolition work preceded by plant strip-out, FAV and MCA remediation.

Group 2@2xCreated with Sketch. Play Video

EVOLUTION OF THE DEMOLITION PROJECT

Group 2@2xCreated with Sketch. Play Video

TECHNICAL DETAILS

SELECTIVE DEMOLITION AND STRIP OUT

Main activities:

  • Deconstruction by disc and diamond wire cutting
  • Demolition with remote-controlled excavators to comply with the highest safety standards
  • Demolition with 30 meters boom excavators
  • Waste management with LEED Level 2 certification
  • Execution of dust sampling and vibration testing of surrounding buildings with the consultancy of the University of Florence

Some numbers of the project:

  • 25,000 tonnes of concrete
  • About 2,000 tonnes of ferrous materials
  • Over 100 tonnes of hazardous materials discarded
  • Over 50 inspections by inspection organisations
  • Lead time: about 12 months in total