PORTO TOLLE: INDUSTRIAL BUILDING DEMOLITION
Dismantling and remediation of CTE retro boilers, pump room and pipes containing OCD for Enel S.p.A. The power plant is divided into four power generation groups of 660MW each, fueled with dense fuel oil (OCD) as the main fuel and diesel oil as the auxiliary liquid fuel.
TECHNICAL DETAILS
DISMANTLING AND REHABILITATION
Main areas of the Enel S.p.A. Porto Tolle site subject to industrial building demolition and remediation work:
- back boiler groups 3-4;
- CO2 cabins;
- CO2 tanks, acid and soda including pipes, supports and walkways;
- OCD pipelines;
- Diesel fuel pumping and unloading stations.
Some numbers of the project:
- about 12,000 tons of iron demolished;
- 2,500 meters of pipelines containing dense fuel oil, reclaimed and dismantled.